Ceiling Mounted Monorail
Ceiling Mounted Monorail Fall Protection System
5DayQuickShipIcon_small



yellowbar

When floor space is at a premium, ceiling mounted monorails can provide unparalleled fall protection while maintaining an open floor plan for material handling, production, or related activities. Ceiling mounted monorails use existing support steel for overall anchorage strength, and are ideal for production facilities and warehouses with tall ceilings since column support is not needed. Even if the facility has standard ceiling heights, the compact, low-profile design of ceiling mounted monorails provides full protection without headroom concerns. 

thickRule
FEATURES & BENEFITS
openProductDetailsIcon
  • Provides mobility along a single axis for applications when workers need to travel in a straight line
  • Curved track sections available
  • Variety of hanger options available to accommodate various building structures 
  • Unlimited monorail lengths with up to 50’ between supports (dual trussed track only)
  • Systems are designed for workers up to 310lbs with tools when used with 900LB Maximum Arresting Force (MAF) energy absorbing lanyards, properly rated full-body harnesses and connecting device
  • Track can accommodate single or multiple workers, dual bypassing track allows workers to safely pass each other without disconnecting
  • Fall Clearance Calculations
  • Provides mobility along a single axis for applications when workers need to travel in a straight line
  • Curved track sections available
  • Variety of hanger options available to accommodate various building structures 
  • Unlimited monorail lengths with up to 50’ between supports (dual trussed track only)
  • Systems are designed for workers up to 310lbs with tools when used with 900LB Maximum Arresting Force (MAF) energy absorbing lanyards, properly rated full-body harnesses and connecting device
  • Track can accommodate single or multiple workers, dual bypassing track allows workers to safely pass each other without disconnecting
  • Fall Clearance Calculations
thickRule
OPTIONS

closeMenuIcon

• Enclosed track / easy movement and long life 
• Rigid runways / superior load positioning – no movement or “crabwalking” of the bridge
• Ease of Installation / install on any standard 6" concrete floor 
• Smooth rolling surface / Easier movement of bridge and trolleys 
• Multiple track profiles and spanning capabilities/Adaptable, flexible, and cost competitive
• Special finishes available based on application requirements
• Recover Trolley

• Enclosed track / easy movement and long life 
• Rigid runways / superior load positioning – no movement or “crabwalking” of the bridge
• Ease of Installation / install on any standard 6" concrete floor 
• Smooth rolling surface / Easier movement of bridge and trolleys 
• Multiple track profiles and spanning capabilities/Adaptable, flexible, and cost competitive
• Special finishes available based on application requirements
• Recover Trolley

thickRule
PHOTOS

customer tether track monorail Fall Arrest-single pole - Mast-Large Fall Arrest-Swing Arm-FS Bohl_Crane_FP_008 IMG_1791 Tether Track Ceiling Mounted Monorail_2 TT Freestanding Monorail.jpg (2) IMG_1785 IMG_0236 Fold Away Tether Track 2 CertainTeed - Single Pole Tether Track
thickRule
CASE STUDIES

closeMenuIcon

FileDownload
Cantilevered Monorail Tether Track System protects workers during truck loading process for a pipe manufacturer Download
Tether Track Fold Away System offers workers protection at heights during production of large mining machinery Download
Tether Track Monorails keep workers safe over conveyor systems Download
Tether Track Ceiling Mounted Monorail protects workers on hand rails, work platforms, and step stairs. Download
Tether Track Anchor System in hybrid bus maintenance facility. Download
Tether Track Dual Monorail Systems keep employees safe on top of RV's and coaches during maintenance. Download
thickRule
FAQS

closeMenuIcon

•  How do I purchase Gorbel® products?
Gorbel® products are sold through an extensive network of distributors across North America and in major markets throughout the world. Call us at (844) 268-7055 or (585) 924-6262 to find a Gorbel® distributor in your area.

•  Where do I find the Serial Number of my Gorbel® Crane?
Our serial number can be found on the crane itself, on the front of the installation & maintenance manual, on the general arrangement drawing, and on the order verfication. The serial number is a six character sequence: 123456

•  How do I order parts for my Gorbel® Crane?
In order to get the correct parts you will need the Serial Number off the Gorbel® Crane System. You may either contact the dealer that sold the equipment originally or contact Gorbel® at (844) 268-7055 for other options or if you cannot locate the serial number.

•  When is customer service available?
Our customer service department can be reached Monday - Thursday 7am-7pm and Fridays from 7am-5pm Eastern Time.

 If I know nothing about your products, how do I find the best options for my application?
We have a wizard that will take you through questions about your application and point you in the right direction. Find the product wizard.

•  I am an Architect / Engineer looking to Specify Gorbel® products. Where do I find CSI Specifications?
We have an Architect & Engineering website just for you! At the site you can view and download 3 part architectural specifications in either .doc or .pdf format and configure a crane complete with drawings and loading information. Find out more...

 I just purchased a Gorbel® Crane, how do I register the warranty?
You should have received with your order a warranty registration form. You can either fill that out and fax it back to us at (844) 268-7055 or go on-line and fill out the form.

•  Who should I contact if my order is lost or has missing or damaged parts?
Make a note on the bill of lading of what is missing or damaged then contact the freight company. If items are damaged a freight claim will need to be filed immediately, as carriers will only accept claims during the two weeks following a delivery.
•  How do I purchase Gorbel® products?
Gorbel® products are sold through an extensive network of distributors across North America and in major markets throughout the world. Call us at (844) 268-7055 or (585) 924-6262 to find a Gorbel® distributor in your area.

•  Where do I find the Serial Number of my Gorbel® Crane?
Our serial number can be found on the crane itself, on the front of the installation & maintenance manual, on the general arrangement drawing, and on the order verfication. The serial number is a six character sequence: 123456

•  How do I order parts for my Gorbel® Crane?
In order to get the correct parts you will need the Serial Number off the Gorbel® Crane System. You may either contact the dealer that sold the equipment originally or contact Gorbel® at (844) 268-7055 for other options or if you cannot locate the serial number.

•  When is customer service available?
Our customer service department can be reached Monday - Thursday 7am-7pm and Fridays from 7am-5pm Eastern Time.

 If I know nothing about your products, how do I find the best options for my application?
We have a wizard that will take you through questions about your application and point you in the right direction. Find the product wizard.

•  I am an Architect / Engineer looking to Specify Gorbel® products. Where do I find CSI Specifications?
We have an Architect & Engineering website just for you! At the site you can view and download 3 part architectural specifications in either .doc or .pdf format and configure a crane complete with drawings and loading information. Find out more...

 I just purchased a Gorbel® Crane, how do I register the warranty?
You should have received with your order a warranty registration form. You can either fill that out and fax it back to us at (844) 268-7055 or go on-line and fill out the form.

•  Who should I contact if my order is lost or has missing or damaged parts?
Make a note on the bill of lading of what is missing or damaged then contact the freight company. If items are damaged a freight claim will need to be filed immediately, as carriers will only accept claims during the two weeks following a delivery.